During HDD and microtunneling operations, pipelines are exposed to extreme mechanical stresses that standard anticorrosion coatings are not designed to withstand:
Mitigating these risks requires purpose-designed mechanical protection systems, not generic coatings.
EPC-S is a fully engineered mechanical protection system developed specifically for HDD and tunneling applications.
The system consists of:
The EPC-S system is based on a patented composite protection concept, developed to address the mechanical stresses specific to HDD and trenchless installations.
• Sub-crossing of the Danube River for the interconnection of the natural gas transmission systems of Romania and Bulgaria with the Backup Pipeline; contractor: AMARAD SA; beneficiaries: TRANSGAZ and BULGARTRANSGAZ.
• “DN 700 PN 40 Natural Gas Transmission Pipeline Gănești – Idrifaia – Coroi” – contractor: Cis Gaz; beneficiary: SNTGN TRANSGAZ SA.
• DN 600 Bordei – contractor: INSPET; beneficiary: SNTGN TRANSGAZ SA.
• Mureș River sub-crossing – contractor: CONDMAG; beneficiary: SNTGN TRANSGAZ SA.
• Fântânele – contractor: INSPET; beneficiary: SNTGN TRANSGAZ SA.
• “Replacement of 20″ pipeline Urziceni – Moara Domnească” – contractor: INSPET; beneficiary: SNTGN TRANSGAZ SA.
• Danube crossing, Line 1 – contractor: INSPET; beneficiary: SNTGN TRANSGAZ SA.
• Storage Facility 25 Săvinești – contractor: MOLDOCOR; beneficiary: SNTGN TRANSGAZ SA.
• Securing works for the DN 800 mm natural gas transmission pipeline Sendreni – Siliștea – Bucharest, in the Scorțaru Vechi – Comăneasca area – contractor: HABAU; beneficiary: SNTGN TRANSGAZ SA.
• BRUA – contractor: INSPET; beneficiary: SNTGN TRANSGAZ SA.
• 32″ BRUA Pipeline – contractor: INSPET; beneficiary: SNTGN TRANSGAZ SA.
• BRUA Phase 1, Lot 2 – contractor: HABAU; beneficiary: SNTGN TRANSGAZ SA.
• BRUA Phase 1, Lot 3 – contractor: HABAU; beneficiary: SNTGN TRANSGAZ SA.
• Olt River sub-crossing – contractor: INSPET; beneficiary: SNTGN TRANSGAZ SA.
• SSTG 38 Hurezani – SSTG 2 Totea – contractor: Comesad; beneficiary: SNTGN TRANSGAZ SA.
• Gas pipelines – safety works Bustuchin – contractor: Comesad; beneficiary: SNTGN TRANSGAZ SA.
• Vadu – Grădina gas transmission pipeline – contractor: PETROCONST; beneficiary: SNTGN TRANSGAZ SA.
• Fixed station insulation – Danube and Borcea sub-crossings – contractor: Cis Gaz; beneficiary: CONPET.
• “DN 500 mm pipelines with a total length of 500 m – Fieni” – contractor: SNTGN TRANSGAZ SA; beneficiary: SNTGN TRANSGAZ SA.
• Insulation using resin and fiberglass tapes – contractor: S.C. EURO TRADE CONSULTING S.R.L.; beneficiary: OMV PETROM.
• Connection and SRMP BICAU 2, Pomi Commune, Satu Mare County – contractor: Totalgaz Industrie SRL; beneficiary: SNTGN TRANSGAZ SA.
• Insulation using resin and fiberglass tapes – contractor: PRODREP STAR; beneficiary: PETROM Park, Potlogi locality, Dâmbovița County.
• Rehabilitation of gas pipeline system, Predești Park 1 – SRMP – contractor: Comesad; beneficiary: SNTGN TRANSGAZ SA.
• Access connection – connection and SRMP Flămânzi, Botoșani County – contractor: Totalgaz Industrie SRL; beneficiary: SNTGN TRANSGAZ SA.
• Tubular materials and fittings, Timișoara – contractor: Industrial MD Trading; beneficiary: SNTGN TRANSGAZ SA.
• Insulation using the EPC-S system based on epoxy composites and fiberglass for one (1) pentane storage tank – contractor: Izolații Conducte; beneficiary: SISTEMPLAST SA.
• Participation in the Danube River sub-crossing project, part of the infrastructure of the “Black Sea Coast” natural gas transmission pipeline.
We deliver a clearly defined and controlled scope of services:
The pipes come from verified industrial sources with production capacity and quality control systems.
Integrating pipe supply with the application of protective systems shifts risk from the construction site to a controlled environment.
Our engineering team will evaluate your project conditions and recommend the optimal mechanical protection system for safe installation and long-term performance.